Gantt chart

A Gantt chart draws tasks as horizontal bars spanning a time range, which makes schedule, duration, sequence and overlap readable at a glance.

SELECT kuva_render(to_json({
'title': 'Project plan',
'x_axis': {'name': 'week'},
'series': [{
'type': 'gantt',
'tasks': tasks
}]
})) AS chart
FROM (
SELECT list({'label': task, 'start': start, 'end': "end"} ORDER BY start) AS tasks
FROM read_csv_auto('{{DFK_BASE_URL}}data/gantt.tsv')
);

Labels are drawn inside a bar when there is room and to its right when there is not; the right margin grows to fit them, so an outside label is never clipped.

Groups and phases​

Give a task a group and it lands under a shaded header row, coloured from the palette. Tasks within a group keep their list order, so the query controls both the phase order and the order inside a phase.

SELECT kuva_render(to_json({
'title': 'Phased plan',
'x_axis': {'name': 'week'},
'series': [{
'type': 'gantt',
'tasks': tasks,
'group_order': ['Design', 'Build', 'Launch']
}]
})) AS chart
FROM (
SELECT list({'label': task, 'start': start, 'end': "end",
'group': phase,
'progress': progress,
'milestone': CASE WHEN milestone IN ('yes', 'true', '1') THEN TRUE ELSE FALSE END}
ORDER BY phase, start) AS tasks
FROM read_csv_auto('{{DFK_BASE_URL}}data/gantt.tsv')
);

group_order fixes the phase order explicitly; groups not listed follow afterwards in first-seen order. Without it, phases appear in the order the tasks arrive — which is why the example sorts by phase first.

Progress fills and the now line​

progress (clamped to 0–1) adds a darker inner fill showing how much of a task is done, which is what turns a plan into a status report. now_line draws a dashed vertical line at a given x — the current period — so the reader can see what should be finished by now.

SELECT kuva_render(to_json({
'title': 'Progress at week 6',
'x_axis': {'name': 'week'},
'series': [{
'type': 'gantt',
'tasks': tasks,
'group_order': ['Design', 'Build', 'Launch'],
'now_line': 6
}]
})) AS chart
FROM (
SELECT list({'label': task, 'start': start, 'end': "end",
'group': phase,
'progress': progress,
'milestone': CASE WHEN milestone IN ('yes', 'true', '1') THEN TRUE ELSE FALSE END}
ORDER BY phase, start) AS tasks
FROM read_csv_auto('{{DFK_BASE_URL}}data/gantt.tsv')
);

Milestones​

milestone: true turns a task into a diamond at a single point in time rather than a bar — for a sign-off, a code freeze, a launch. Give it start == end at the moment it happens, and its label is drawn in bold to the right.

SELECT kuva_render(to_json({
'title': 'With milestones',
'x_axis': {'name': 'week'},
'series': [{
'type': 'gantt',
'tasks': tasks,
'group_order': ['Design', 'Build', 'Launch'],
'now_line': 6,
'milestone_size': 9
}]
})) AS chart
FROM (
SELECT list({'label': task, 'start': start, 'end': "end",
'group': phase,
'progress': progress,
'milestone': CASE WHEN milestone IN ('yes', 'true', '1') THEN TRUE ELSE FALSE END}
ORDER BY phase, start) AS tasks
FROM read_csv_auto('{{DFK_BASE_URL}}data/gantt.tsv')
);

Sizing and colours​

FieldDefaultWhat it sets
bar_height0.6Bar thickness as a share of the row height, clamped to [0.1, 1]
milestone_size7Diamond half-size, in pixels
show_labelstrueDraw the task and milestone labels
colorsteelblueThe bar colour when there are no groups
group_bg#ebebebThe group header row's background

A per-task color overrides both the group colour and the default, which is how one late task is singled out without giving it a phase of its own.

SELECT kuva_render(to_json({
'title': 'Taller bars, tighter rows',
'x_axis': {'name': 'week'},
'series': [{
'type': 'gantt',
'tasks': tasks,
'group_order': ['Design', 'Build', 'Launch'],
'bar_height': 0.85,
'group_bg': '#f0f0f5'
}]
})) AS chart
FROM (
SELECT list({'label': task, 'start': start, 'end': "end",
'group': phase,
'progress': progress,
'milestone': CASE WHEN milestone IN ('yes', 'true', '1') THEN TRUE ELSE FALSE END}
ORDER BY phase, start) AS tasks
FROM read_csv_auto('{{DFK_BASE_URL}}data/gantt.tsv')
);

Fields​

FieldTypeWhat it sets
taskstask[]Required. Each entry is {label, start, end, group?, progress?, color?, milestone?}.
now_linenumberDraw the "now" line at this x.
group_orderstring[]Explicit phase order; unlisted groups follow.
bar_heightnumberBar thickness as a share of the row (default 0.6).
milestone_sizenumberDiamond half-size in pixels (default 7).
show_labelsbooleanDraw the labels (default on).
colorstringDefault bar colour when there are no groups.
group_bgstringGroup header background (default #ebebeb).
legendstringLegend label for the series.

Notes​

  • tasks must not be empty, and every task needs label, start and end.
  • Times are plain numbers — days, weeks, months — anything you like, as long as one unit is one x unit.
  • A task with milestone: true should have start == end; a non-zero span draws a diamond at the start and ignores the end.
  • group_order does not filter: a group present in the tasks but missing from the list still gets a header, after the listed ones.
  • Rows appear in list order within a group, so the query's ORDER BY is the schedule.

See also​